File #: K-2021-108    Version: 1 Name: 12th Ave NE Manhole Replacement Contract
Type: Contract Status: Passed
File created: 4/28/2021 In control: City Council
On agenda: 5/11/2021 Final action: 5/11/2021
Title: CONSIDERATION OF APPROVAL, ACCEPTANCE, REJECTION, AMENDMENT, AND/OR POSTPONEMENT OF BID 2021-63, CONTRACT K-2021-108 BY AND BETWEEN THE NORMAN UTILITIES AUTHORITY AND MATTHEWS TRENCHING COMPANY, INC., IN THE AMOUNT OF $1,180,250; PERFORMANCE BOND B-2021-77; STATUTORY BOND B-2021-78; MAINTENANCE BOND MB-2021-59 FOR THE 12TH AVENUE N.E. MANHOLE REPLACEMENT PROJECT; AUTHORIZING THE UTILITIES DIRECTOR TO PURCHASE MATERIALS ON BEHALF OF THE CONTRACTOR; AND AUTHORIZING TRANSFER OF PROJECT FUNDS AS OUTLINED IN THE STAFF REPORT.
Attachments: 1. City Council Staff Report, 2. Tabulation, 3. Contracts & Bonds, 4. Project Map
Title
CONSIDERATION OF APPROVAL, ACCEPTANCE, REJECTION, AMENDMENT, AND/OR POSTPONEMENT OF BID 2021-63, CONTRACT K-2021-108 BY AND BETWEEN THE NORMAN UTILITIES AUTHORITY AND MATTHEWS TRENCHING COMPANY, INC., IN THE AMOUNT OF $1,180,250; PERFORMANCE BOND B-2021-77; STATUTORY BOND B-2021-78; MAINTENANCE BOND MB-2021-59 FOR THE 12TH AVENUE N.E. MANHOLE REPLACEMENT PROJECT; AUTHORIZING THE UTILITIES DIRECTOR TO PURCHASE MATERIALS ON BEHALF OF THE CONTRACTOR; AND AUTHORIZING TRANSFER OF PROJECT FUNDS AS OUTLINED IN THE STAFF REPORT.

Body
BACKGROUND: The Norman Utilities Authority (NUA) is completing the 12th Avenue NE Manhole Replacement Project to replace 36 manholes that are on the 24-inch sewer line that receives the discharge from Lift Station D. Lift Station D is located on the north side of the City and receives sewer flows from the Little River sewer shed. Flows are screened at Lift Station D and then pumped over the ridge to the 24-inch line. Due to the time for flows to reach the 24-inch line, hydrogen sulfide concentrations have time to increase which has severely degraded the existing concrete manholes. This project will remove the degraded manholes and will install new, corrosion-resistant manholes which are necessary for maintenance operations and are required pursuant to Oklahoma Department of Environmental Quality regulations.

DESCRIPTION: The Invitation to Bid for Bid-2021-63 for Project WW0330 - 12th Avenue NE Manhole Replacements was published in the Norman Transcript on April 1 and April 8, 2021. A non-mandatory pre-bid conference was held on April 12, 2021 and four contractors attended. Bids were received from three contractors and were opened on April 22, 2021. The bids ranged from $1,180,250 to $1,710,920 with Matthews Trenching Co., Inc., being the lowest, responsible bidder.

Funding for the project is from the Sewer Maintenance Fund (321). This manhole project was planned to be done with another project but was split off due to t...

Click here for full text