File #: K-1617-91 CO#2    Version: 1 Name: Change Order and Final Acceptance 2016 Bond Road Reconstruction; Iowa Street, Phase IC,
Type: Contract Status: Passed
File created: 10/8/2018 In control: City Council
On agenda: 12/11/2018 Final action: 12/11/2018
Title: CHANGE ORDER NO. TWO TO CONTRACT K-1617-91: BY AND BETWEEN THE CITY OF NORMAN, OKLAHOMA, AND RDNJ, L.L.C., D/B/A A-TECH PAVING, DECREASING THE CONTRACT AMOUNT BY $41,435.67 FOR A REVISED CONTRACT AMOUNT OF $561,869.15 FOR THE 2010 BOND ROAD RECONSTRUCTION; IOWA STREET, PHASE IC AND FINAL ACCEPTANCE OF THE PROJECT.
Attachments: 1. Text File, 2. Change Order No 2, 3. 2010 Bond Reconstruction Map Iowa Street Phase I, II, & III, 4. Pay App #12 Final K-1617-91
Title
CHANGE ORDER NO. TWO TO CONTRACT K-1617-91: BY AND BETWEEN THE CITY OF NORMAN, OKLAHOMA, AND RDNJ, L.L.C., D/B/A A-TECH PAVING, DECREASING THE CONTRACT AMOUNT BY $41,435.67 FOR A REVISED CONTRACT AMOUNT OF $561,869.15 FOR THE 2010 BOND ROAD RECONSTRUCTION; IOWA STREET, PHASE IC AND FINAL ACCEPTANCE OF THE PROJECT.

Body
BACKGROUND: In the Norman General Obligation Bond Election of March 2, 2010, voters approved a 5-year, 4-phase program of street maintenance on neighborhood streets. The 2010 Street Maintenance Bond Program includes four categories as follows:

* Urban Asphalt Street Maintenance
* Urban Concrete Street Maintenance
* Rural Road Maintenance
* Urban Street Reconstruction

The final two projects in the "Urban Street Reconstruction" category required outside engineering design services due to the complexity of the stormwater drainage improvements. Those two projects involved eleven (11) residential blocks of total street reconstruction on Dakota and Iowa Streets. The proposed projects were split into phases as follows:

Phase I - Iowa Street- Berry Road to Pickard Avenue;
Phase II - Dakota Street- Berry Road to Flood Avenue;
Phase III - Dakota and Iowa Streets- Flood Avenue to University Boulevard

Each project was further divided into three (3) parts as follows:

Part A: Service utilities - performed by City of Norman Utilities Department;
Part B: Asphalt pavement & stormwater system - performed by City of Norman Public Works Department
Part C: Concrete pavement, curb and gutter and driveways - performed by Contractor

It was anticipated that this approach would provide significant cost savings and expedite the project.

DISCUSSION: On March 31, 2016, a bid opening was held for these projects and only one bid was received. The Engineer's Estimate was $3,053,824. A-Tech Paving submitted the sole bid of $3,201,241, which was $147,417 or 4.83% over the estimate. City staff recommended the bid be rejected and the project rebid.

The bid openi...