File #: FP-1819-5    Version: 1 Name: Final Plat Summit Lakes Addition Section 11
Type: Final Plat Status: Passed
File created: 10/9/2018 In control: City Council
On agenda: 10/23/2018 Final action: 10/23/2018
Title: CONSIDERATION OF A FINAL PLAT FOR SUMMIT LAKES ADDITION, SECTION 11, WITH DEFERRAL OF STREET PAVING, STORMWATER IMPROVEMENTS AND SIDEWALKS IN CONNECTION WITH 24TH AVENUE S.E.; ACCEPTANCE OF THE PUBLIC DEDICATIONS CONTAINED THEREIN AND BUDGET APPROPRIATION. (GENERALLY LOCATED ONE-HALF MILE SOUTH OF ALAMEDA STREET ON THE EAST SIDE OF 24TH AVENUE S.E.).
Attachments: 1. Text File, 2. Location Map, 3. Final Plat, 4. Reapproval Preliminary Plat, 5. Application, 6. Materials Estimate List, 7. Staff Report
Title
CONSIDERATION OF A FINAL PLAT FOR SUMMIT LAKES ADDITION, SECTION 11, WITH DEFERRAL OF STREET PAVING, STORMWATER IMPROVEMENTS AND SIDEWALKS IN CONNECTION WITH 24TH AVENUE S.E.; ACCEPTANCE OF THE PUBLIC DEDICATIONS CONTAINED THEREIN AND BUDGET APPROPRIATION. (GENERALLY LOCATED ONE-HALF MILE SOUTH OF ALAMEDA STREET ON THE EAST SIDE OF 24TH AVENUE S.E.).

Body
BACKGROUND: This item is a final plat for Summit Lakes Addition, Section 11, and is generally located one-half mile south of Alameda Street on the east side of 24th Avenue S.E. This final plat consists of 62 single-family residential lots on 25.84 acres. There are 542 platted lots within the development. There are 170 residential lots remaining to be final platted.

City Council, at its meeting of February 29, 1972, adopted Ordinance O-7172-50, September 4, 1984, adopted Ordinance O-8485-5 and August 26, 2003 adopted Ordinance O-0304-2 placing this property in the R-1, Single Family Dwelling District.

The City Development Committee reapproved the preliminary plat for Summit Lakes Addition on September 6, 2018. The City Development Committee approved the program of public improvements and the final plat for Summit Lakes Addition, Section 11 and recommended to City Council the deferral of street paving and sidewalks in connection with the 24th Avenue S.E. Paving Project.

DISCUSSION: Construction plans have been reviewed for the required public improvements for this property. These improvements consist of sanitary sewer mains, water mains with fire hydrants, stormwater, street paving and sidewalk improvements.

Approximately 657 feet of 24th Avenue S.E. will be required to be constructed to City standards as a half-width arterial street. Section 19-602 B 1.2. (a)(b)(c) and (d) of the City Code establishes a method of deferring public street improvements under the following situations: (a) where incompatible grades exist; (b) where there are inadequate or a lack of connecting facilities; (c) wh...

Click here for full text