File #: K-1617-120 AMD#2    Version: 1 Name: Meshek Contract Additional Engineering Criteria Review
Type: Contract Status: Passed
File created: 6/7/2018 In control: City Council
On agenda: 6/26/2018 Final action: 6/26/2018
Title: AMENDMENT NO. TWO TO CONTRACT K-1617-120: BY AND BETWEEN THE CITY OF NORMAN, OKLAHOMA, AND MESHEK AND ASSOCIATES, L.L.C. INCREASING THE CONTRACT AMOUNT BY $73,970 FOR A REVISED CONTRACT AMOUNT OF $347,474 TO PROVIDE ENGINEERING SERVICES FOR THE DESIGN OF FOUR STORMWATER PROJECTS, INCLUDING PREPARATION OF BID DOCUMENTS, AND REVIEW OF THE ENGINEERING DESIGN CRITERIA.
Attachments: 1. Master Text File, 2. Amend 2 - K-1617-120, 3. Attachment 1 Creston Way & Schulze Drive Map, 4. Attachment 2 36th NW and Tecumseh Map, 5. Attachment 3 Merkle Creek near Cleveland Elementary Map, 6. Attachment 4 Vineyard Drainage Improvements Map, 7. Attachment 5 36th NW and Tecumseh Storm Sewer Map, 8. Requisition for Meshek AMD2
Title
AMENDMENT NO. TWO TO CONTRACT K-1617-120: BY AND BETWEEN THE CITY OF NORMAN, OKLAHOMA, AND MESHEK AND ASSOCIATES, L.L.C. INCREASING THE CONTRACT AMOUNT BY $73,970 FOR A REVISED CONTRACT AMOUNT OF $347,474 TO PROVIDE ENGINEERING SERVICES FOR THE DESIGN OF FOUR STORMWATER PROJECTS, INCLUDING PREPARATION OF BID DOCUMENTS, AND REVIEW OF THE ENGINEERING DESIGN CRITERIA.

Body
BACKGROUND:
Three stormwater projects have been funded in the City's Capital Budget in previous fiscal years to address specific flooding or maintenance issues: Creston Way and Schulze Drive, 36th Ave NW and Tecumseh Road, and Merkle Creek behind Cleveland Elementary School. These projects have not been completed due to a shortage of staff.

The Creston Way and Schulze Drive project is located between Creston Way and Schulze Drive in the central part of Norman in the Bishop Creek watershed (Ward 4). The current drainage system consists of a concrete flume connected to a stormwater pipe which is then connected to a second concrete flume. The system is believed to be undersized and contributing to flooding at homes on Creston Way. The City's goal is to make improvements to the undersized stormwater pipeline in this area to eliminate flooding problems at homes located on Creston Way.

The 36th Ave NW and Tecumseh Road project is located at the intersection of 36th Avenue NW and Tecumseh Road in the Little River watershed (Ward 8). The current drainage system consists of a box culvert under Tecumseh Road to the west of 36th Avenue NW which drains to an open channel. The open channel receives flow from McBride Orthopedic Hospital on the east as well as MidFirst Bank and a ONEOK Gas Transportation, LLC, property from the southeast. The open channel enters a small detention pond to the immediate west of the channel before entering a stormwater pipe to the north. The City's goal is to determine the cause of flooding to homes north of McBride Orthopedic Hospital on Buckingham Drive, ens...