File #: FP-1718-21    Version: Name: Final Plat for The Barn at Terra Verde
Type: Final Plat Status: Passed
File created: 5/21/2018 In control: City Council
On agenda: 6/12/2018 Final action: 6/12/2018
Title: CONSIDERATION OF A FINAL PLAT FOR THE BARN AT TERRA VERDE SCHOOL, DEFERRAL OF STREET PAVING, SIDEWALKS, AND WATER MAIN IMPROVEMENTS IN CONNECTION WITH 36TH AVENUE S.E., AND ACCEPTANCE OF PUBLIC DEDICATIONS CONTAINED THEREIN. (1000 36TH AVENUE S.E.)
Attachments: 1. Text File, 2. Location Map, 3. Staff Report, 4. Final Plat, 5. Site Plan, 6. Preliminary Plat, 7. Deferral of Public Improvements, 8. Application
Title
CONSIDERATION OF A FINAL PLAT FOR THE BARN AT TERRA VERDE SCHOOL, DEFERRAL OF STREET PAVING, SIDEWALKS, AND WATER MAIN IMPROVEMENTS IN CONNECTION WITH 36TH AVENUE S.E., AND ACCEPTANCE OF PUBLIC DEDICATIONS CONTAINED THEREIN. (1000 36TH AVENUE S.E.)

Body
BACKGROUND: This item is a final plat for The Barn at Terra Verde School that is generally located at 660' north of East Lindsey Street on the west side of 36th Avenue S.E. (1000 36th Avenue S.E.).

City Council, at its meeting of October 30, 1961, adopted Ordinance No. 1339, placing a portion of this property in A-2, Rural Agricultural District. City Council approved the preliminary plat for The Barn at Terra Verde Addition at its meeting of April 10, 2018. The City Development Committee, at its meeting of May 21, 2018, reviewed and approved the program of improvements, site plan and final plat for The Barn at Terra Verde School and recommended that the site plan and final plat be submitted to City Council for consideration including deferral of street paving, sidewalks and twelve-inch water main in connection with 36th Avenue S.E. This property consists of 10.868 acres and one (1) lot with a proposal of a new recreational facility and parking lot for the Terra Verde School.

DISCUSSION: Construction plans have been reviewed for the required public improvements for this property. An 8" public sanitary sewer main and a 12" water main with fire hydrant will be connected to the Siena Springs development.

Approximately 30-feet of 36th Avenue S.E. will be required to be constructed to City standards as a half-width arterial street. Section 19-602 B 1.2. (a)(b)(c) and (d) of the City Code establishes a method of deferring public street improvements under the following situations: (a) where incompatible grades exist; (b) where there are inadequate or a lack of connecting facilities; (c) where construction the improvement would not immediately function for its intended use; or (d) where such improvement...

Click here for full text