File #: K-1718-97    Version: 2 Name: NPL East Furniture Installation
Type: Contract Status: Passed
File created: 3/6/2018 In control: City Council
On agenda: 3/13/2018 Final action: 3/13/2018
Title: CONSIDERATION OF AWARDING BID 1718-41, GROUPS H AND J, AND APPROVAL OF CONTRACT K-1718-97 BY AND BETWEEN THE NORMAN MUNICIPAL AUTHORITY AND PINNACLE DESIGN GROUP, LLC IN THE AMOUNT OF $2,562.99 FOR INSTALLATION OF FURNITURE AND ACCESSORIES, GROUPS H AND J, AT NORMAN PUBLIC LIBRARY EAST.
Attachments: 1. Text File, 2. Bid Tab, 3. NPL Group H & J Bid Specs, 4. Furniture Plan, 5. Contract

Title

CONSIDERATION OF AWARDING BID 1718-41, GROUPS H AND J, AND APPROVAL OF CONTRACT K-1718-97 BY AND BETWEEN THE NORMAN MUNICIPAL AUTHORITY AND PINNACLE DESIGN GROUP, LLC IN THE AMOUNT OF $2,562.99 FOR INSTALLATION OF FURNITURE AND ACCESSORIES, GROUPS H AND J, AT NORMAN PUBLIC LIBRARY EAST.

 

Body

BACKGROUND:  On 6 October 2015, Norman citizens passed the NORMAN FORWARD Initiative funding a variety of projects through a ½ cent sales tax increase over 15 years.  Included in the Norman Forward Initiative was a project to construct a new Library Branch on East Alameda St. near Fire Station #9.  This Library will also be a Leadership in Energy and Environmental Design (LEED) Certified project, with native plants and grasses incorporated into the landscaping.  The East Branch Library construction has been underway since the spring of 2017, and is scheduled to open this summer.  As the construction progress continues it was timely to move forward with ordering and installing furnishings.

 

The 12,000 square foot (sq. ft.) Norman Public Library East Branch will include 3,700 sq. ft. of adult/teen space (with 38 reader seats and 20 computer stations), 1,100 sq. ft. of children’s space, a public meeting room with seating for 100, study room, public/staff meeting room, tablet lending services, staff space and public area open seating. This item asks Council to award bids for these furnishings.

 

DISCUSSION:  Bid 1718-41 was advertised in The Norman Transcript, on January 16 and January 23, 2018.  The bid was opened on February 6, 2018.  Four (4) bids were received. The bid package included nine (9) different furniture groups that bidders could bid either individually or collectively.

 

These groups are as follows:

 

Group A (Community): Lectern

Group B (Freshcoat): Small accessory chairs

Group C (JSI): Study tables

Group D (Keilhauer): Visitor/public area seats and table

Group E (Leland): Hard-backed chairs, chair dolly and tables

Group F (Mitylite): Fold-out tables and table transport cart

Group G (MJ Industries): Library Shelving

Group H (Watson): Markerboards

Group J (Shaw): Carpet tile for Children’s Area rug

 

* note: Group I was not categorized in this bid

 

Due to bidders having the option to bid any or all groups, bid totals varied, and groups could be awarded individually or in portions. PDG, LLC is the low bidder for Groups H and J, for a contract total of $2,562.99. The contract includes the products specified in the group, delivery and subsequent installation of the product, along with a one-year warranty.

 

In total, $382,500 was budgeted for the furniture, fixtures and equipment (FFE) budget on the East Library. In total, including other bid groups to be awarded (Groups A-G); bids were $204,908.63 under the estimated FFE budget. These purchases are being made directly by the Norman Municipal Authority and are therefore sales tax-exempt.

 

Contract K-1718-97 provides for a delivery and installation date in 94 days after issuance of notice to proceed. It is anticipated that furniture will be delivered and installed in mid-June 2018; with liquidated damages of $500 per day should the project not be completed on time.

 

RECOMMENDATION NO. 1:  It is recommended that the Norman Municipal Authority award Bid 1718-41, Group H and Group J for installation of furniture accessories to Pinnacle Design Group, LLC in the amount of $2,562.99.  Funds are available in East Branch Library, Materials (account 051-9507-455.61-01; project NFB017)

 

RECOMMENDATION NO. 2:  It is further recommended that Contract K-1718-97 be approved and the Mayor/NMA Chair be authorized to sign Performance Bond B-1718-57, Statutory Bond B-1718-58, and Maintenance Bond MB-1718-40.