File #: K-1718-4    Version: 1 Name: Contract award-Royal Oaks Force Main Improvements
Type: Contract Status: Passed
File created: 8/9/2017 In control: City Council
On agenda: 8/22/2017 Final action: 8/22/2017
Title: CONSIDERATION AND AWARDING OF BID 1718-4; APPROVAL OF CONTRACT K-1718-4 BY AND BETWEEN THE NORMAN UTILITIES AUTHORITY AND MCKEE UTILITY CONTRACTORS, INC., IN THE AMOUNT OF $495,502.80; PERFORMANCE BOND B-1718-7, STATUTORY BOND B-1718-8, AND MAINTENANCE BOND MB-1718-4 FOR THE ROYAL OAKS FORCE MAIN IMPROVEMENTS PROJECT.
Attachments: 1. Text File Royal Oaks, 2. Location map, 3. Bid Tab, 4. Recommendation Letter, 5. K-1718-4, 6. PB-1718-7, 7. SB-1718-8, 8. MB-1718-4, 9. PR McKee
Title
CONSIDERATION AND AWARDING OF BID 1718-4; APPROVAL OF CONTRACT K-1718-4 BY AND BETWEEN THE NORMAN UTILITIES AUTHORITY AND MCKEE UTILITY CONTRACTORS, INC., IN THE AMOUNT OF $495,502.80; PERFORMANCE BOND B-1718-7, STATUTORY BOND B-1718-8, AND MAINTENANCE BOND MB-1718-4 FOR THE ROYAL OAKS FORCE MAIN IMPROVEMENTS PROJECT.

..Body
BACKGROUND: In 2001, the citizens of Norman approved a five dollar per month maintenance fee providing for the systematic replacement of aged and deteriorating sewer lines. The Royal Oaks Force Main Improvements project (WW0062) is located on the east side of 24th Avenue SE, from near Alex Plaza Drive south across Alameda Street to near Beaumont Drive just north of Lindsey (map attached).

Two 12-inch pressurized polyvinyl chloride (PVC) force mains, one from Hall Park Lift Station and the other from Royal Oaks Lift Station, join together into a 16-inch ductile iron force main near Alex Plaza Drive. The force main continues south across Alameda to the crest of the hill where it crosses 24th Avenue SE and discharges into an existing 18-inch gravity sewer. The two 12-inch force mains are about 14 years old. However, the 16-inch force main and 18-inch gravity sewer were installed in 1984, are about 33 years old, and need to be replaced.

The project includes about 1,900 feet of 16-inch force main and 2,900 feet of 18-inch gravity sewer. Norman Utilities Authority (NUA) staff is coordinating this project with Public Works staff regarding their bond project to widen 24th Avenue SE.

DISCUSSION: An advertisement for bids was published in the Norman Transcript on June 29 and July 6, 2017. Competitive bids were opened on July 20, 2017. As shown on the attached Bid Record, seven (7) bids were received, ranging between $495,503.80 and $1,034,200. However, as indicated on the Bid Tabulation, mathematical errors in the bid proposals have been corrected. McKee Utility Contractors, Inc. (McKee) of Prague, OK was the low bidder at $495,502.80...