File #: K-1617-61    Version: 1 Name: Contract and Waterline Easement for Robinson WL
Type: Contract Status: Passed
File created: 6/16/2016 In control: City Council
On agenda: 9/13/2016 Final action: 9/13/2016
Title: CONTRACT K-1617-61: A LINE LIST AGREEMENT BY AND BETWEEN THE CITY OF NORMAN, OKLAHOMA, AND WAFFLE HOUSE, INC., FOR WATER LINE CONSTRUCTION TO OCCUR ON PROPERTY OWNED BY WAFFLE HOUSE, INC., AND ACCEPTANCE OF EASEMENT E-1516-36, A PERMANENT WATER LINE EASEMENT IN THE AMOUNT OF $20,155 FOR THE ROBINSON STREET WATER LINE REPLACEMENT (PHASE 1).
Attachments: 1. Text File K-1617-61, 2. Location map, 3. K-1617-61 and E-1617-36
Title
CONTRACT K-1617-61: A LINE LIST AGREEMENT BY AND BETWEEN THE CITY OF NORMAN, OKLAHOMA, AND WAFFLE HOUSE, INC., FOR WATER LINE CONSTRUCTION TO OCCUR ON PROPERTY OWNED BY WAFFLE HOUSE, INC., AND ACCEPTANCE OF EASEMENT E-1516-36, A PERMANENT WATER LINE EASEMENT IN THE AMOUNT OF $20,155 FOR THE ROBINSON STREET WATER LINE REPLACEMENT (PHASE 1).

Body
BACKGROUND: The Robinson Waterline Replacement project (WA0195) was expected to replace approximately 5,300 feet of deteriorated 24-inch waterline along Robinson generally between 36th Avenue NW and 24th Avenue NW. This cast iron waterline was constructed in the early 1970's and has had numerous leaks resulting in significant loss of water and damage to the overlying or adjacent roadway. Repairs to this large diameter water line are very expensive, time consuming for Norman Utilities Authority (NUA) and Norman Public Works staff and are disruptive to traffic in the area as repairs are completed.

Alan Plummer and Associates, Inc. (APAI) was selected as design consultant on January 28, 2014 and the NUA has approved Contract K-1314-110 and two amendments with APAI for design, bidding and construction management for the project. The project was broken into two phases; the Phase 1 project includes approximately 4,600 feet of 30-inch and 3,500 feet of 12-inch waterline and associated appurtenances between Crossroads Boulevard and a point about 1000 feet east of 24th Avenue NW. The location of the proposed Phase 1 improvements is shown on the attached Location Map.

On June 14, 2016, the NUA awarded Bid 1516-34 to McKee Utility Contractors, Inc. (McKee) of Prague, Oklahoma in the amount of $3,337,685 and executed Contract K-1516-33 and bonds to McKee for the Phase 1 project. The contractor began work June 15, 2016 and final completion is scheduled for 282 calendar days or by March 24, 2017. The project is currently 30% complete thus far.

DISCUSSION: Six (6) permanent easements were needed for construction of the pro...