File #: K-1718-5    Version: 1 Name: Crossroads Blvd Area Waterline Project
Type: Contract Status: Passed
File created: 8/29/2017 In control: City Council
On agenda: 9/12/2017 Final action: 9/12/2017
Title: CONSIDERATION AND AWARDING OF BID 1718-5; APPROVAL OF CONTRACT K-1718-5 BY AND BETWEEN THE NORMAN UTILITIES AUTHORITY AND MCKEE UTILITY CONTRACTORS, INC., IN THE AMOUNT OF $1,184,999; PERFORMANCE BOND B-1718-9, STATUTORY BOND B-1718-10, AND MAINTENANCE BOND MB-1718-5 FOR THE CROSSROADS BOULEVARD AREA WATER LINE PROJECT.
Attachments: 1. text File McKee, 2. Crossroads Ltr of Recommendation 8.14.17, 3. K-1718-5, 4. Perf Bond B-1718-9, 5. Stat B-1718-10, 6. MB-1718-5, 7. Location Map, 8. Purchase Req
Title
CONSIDERATION AND AWARDING OF BID 1718-5; APPROVAL OF CONTRACT K-1718-5 BY AND BETWEEN THE NORMAN UTILITIES AUTHORITY AND MCKEE UTILITY CONTRACTORS, INC., IN THE AMOUNT OF $1,184,999; PERFORMANCE BOND B-1718-9, STATUTORY BOND B-1718-10, AND MAINTENANCE BOND MB-1718-5 FOR THE CROSSROADS BOULEVARD AREA WATER LINE PROJECT.

..Body
BACKGROUND: The Crossroads Boulevard Area Waterline project (WA0213) is located north of Robinson Street between I-35 and 36th Avenue NW (map attached). It provides for replacement of about 13,800 feet of ductile iron (D.I.) water line with six-inch (6") and eight-inch (8") C900 Polyvinyl Chloride (PVC) pipe. The existing D.I. pipe is not compatible with the acidic soil and is failing, causing water outages, water loss and damage to driveways, streets, and yards. As shown on the map, a portion of the subdivision lines have already been replaced by the City's Line Maintenance Division. Also, due to similarly rapidly deteriorating operating conditions and as shown on the map, the project includes about 2,000 feet of eight-inch (8") lines along 24th Avenue NW from near Boardwalk to just north of Tee Circle.
DISCUSSION: An advertisement for bids was published in the Norman Transcript on July 20 and 27, 2017. Project bids were opened August 10, 2017. As shown in the attached letter from Cardinal Engineering, Inc. (Cardinal), five (5) bids were received and McKee Utility Contractors, Inc. (McKee) of Prague, Oklahoma was the low bidder at $1,184,999. The engineer's estimate was $1,539,000. Both staff and Cardinal recommend award to McKee. Work should begin during September with a 210 day (7 months) contract completion time.
The Fiscal Year Ending 2018 budget for Crossroads Boulevard Area Waterline includes an unencumbered balance of $ 1,200,820 for Construction (031-9360-462.61-01; Project WA0213), which is sufficient to fund the Contract.
The City of Norman is exempt from the payment of any sales or use taxes. Pursuant to Title ...