File #: K-2021-29 FINAL    Version: 1 Name: Final Acceptance and Payment for the FYE 2021 Sidewalk Horizontal Saw Cutting Project
Type: Contract Status: Passed
File created: 12/22/2020 In control: City Council
On agenda: 1/12/2021 Final action: 1/12/2021
Title: FINAL ACCEPTANCE AND FINAL PAYMENT OF CONTRACT K-2021-29 FOR THE SIDEWALK HORIZONTAL SAW CUTTING PROJECT WITH PRECISION CONCRETE CUTTING OF OKLAHOMA, L.L.C.
Attachments: 1. City Council Staff Report, 2. Invoice, 3. Location Maps
Title
FINAL ACCEPTANCE AND FINAL PAYMENT OF CONTRACT K-2021-29 FOR THE SIDEWALK HORIZONTAL SAW CUTTING PROJECT WITH PRECISION CONCRETE CUTTING OF OKLAHOMA, L.L.C.

Body
BACKGROUND: In recent years, the City Council has appropriated funds in the Capital Fund Budget for the horizontal saw cutting sidewalk program. This program allows the City to contract for outside services to repair trip hazards on sidewalks along a predetermined location. In Federal Year Ending (FYE) 2021 City Council appropriated $41,212.50. This method of repair utilizes tools that allow for saw cut along the sidewalk removing tripping hazards up to 2 inches in height. This method of repair costs much less than the conventional removal, and replacement of panels.

On October 13, 2020, City Council approved the contract to fund the Sidewalk Horizontal Saw Cutting Project by Precision Concrete Cutting of Oklahoma, L.L.C., in the amount of $41,212.50.

The area identified for this project is along the arterial road West Robinson Street from 36th Ave. NW to 48th Ave. NW and the City of Norman municipal complex at 201 West Gray. These areas are shown on the attached maps. These sidewalks have approximately 600 identified tripping hazards over a length of 2.5 miles of sidewalks and the area in the Municipal Campus. Locations identified in the project area that exceed two (2) inches in deflection or damaged beyond this type of repair will be repaired using the FYE 2021 Sidewalk Projects to replace those sections.

Work began in October 15, 2019, and the project was completed by November 10, 2020.

DISCUSSION: Precision Concrete Cutting of Oklahoma, LLC successfully completed the work in the targeted areas for the FYE 2021 Horizontal Saw Cutting Project with a retainage payable amount of $2,060.63.

RECOMMENDATION NO. 1: Staff is recommending acceptance of the Sidewalk Horizontal Saw Cutting Project and authorization of final payment in the amount of $2,060.63 (from Account 50594407-46101,...