File #: K-1516-72 Final    Version: 1 Name: West Main Street Drainage Project
Type: Contract Status: Passed
File created: 11/28/2017 In control: City Council
On agenda: 12/19/2017 Final action: 12/19/2017
Title: FINAL ACCEPTANCE AND FINAL PAYMENT OF CONTRACT K-1516-72 BY AND BETWEEN THE CITY OF NORMAN, OKLAHOMA, AND CENTRAL CONTRACTING SERVICES, INC., FOR THE WEST MAIN STREET DRAINAGE PROJECT
Attachments: 1. Text File K-1516-72 final, 2. Certificate for Payment, 3. K-1519 #4 Affidavit
Title
FINAL ACCEPTANCE AND FINAL PAYMENT OF CONTRACT K-1516-72 BY AND BETWEEN THE CITY OF NORMAN, OKLAHOMA, AND CENTRAL CONTRACTING SERVICES, INC., FOR THE WEST MAIN STREET DRAINAGE PROJECT

Body
BACKGROUND: In an effort relieve the flooding problem along Midway Drive, a portion of the City's 2008 Drainage Project in the Cambridge Place neighborhood consisted of installing drainage inlets at the low point of Midway Drive and carrying the water in storm water pipelines to the system located in the parking lot of Arbor House. This has helped to alleviate some of the flooding problem along Midway Drive but has not completely solved the problem. The project was designed to complete the upgrade to the Midway Drive stormwater system by upsizing the system at and downstream of the Arbor House.

On May 10, 2016, City Council approved Contract K-1516-72 by and between the City of Norman and Central Contracting Services, Inc., for the West Main Street Drainage Project in the amount of $342,715.

On October 25, 2016, City Council approved Change Order No. 1 to Contract K-1516-72 in the amount of $42,154.40 and a transfer of funds from Norman Utilities Authority, Water Distribution System, Construction (account 031-9360-462.61-01; Project WA0184), to Water Projects, Miscellaneous, Construction (account 031-9395-462.61-01; project DR0012), for replacement of approximately six-hundred (600) feet of the 12-inch waterline, including the waterline to be relocated under the new stormwater pipeline.

On December 13, 2016, City Council approved Change Order No. 2 to Contract K-1516-44, between the City of Norman and Central Contracting Services, Inc., and a transfer of funds in the amount of $58,750 from Bridge Maintenance Program, Construction (account 050-9687-431.61-01; project TC0254) to Havenbrook Bridge Repair, Construction (account 050-9352-431.61-01; project SC0621), for furnishing labor and materials for concrete pavement and sidewalk replacement during repair/reconstr...