Title
CHANGE ORDER NO. ONE TO CONTRACT K-1516-43: BY AND BETWEEN THE CITY OF NORMAN, OKLAHOMA, THE NORMAN UTILITIES AUTHORITY, AND MCKEE UTILITY CONTRACTORS, INC. INCREASING THE CONTRACT AMOUNT BY $410,205 FOR A REVISED CONTRACT AMOUNT OF $1,616,228.50. TO ADD THE REHABILITATION OF THE FULL WEST LANE OF BERRY ROAD TO THE BERRY ROAD WATER LINE REPLACEMENT PROJECT, PHASE 2.
Body
BACKGROUND: For many years, the Norman Utilities Authority (NUA) has contemplated replacement of the 14-inch cast iron waterline along Berry Road from Robinson to Lindsey. This waterline was installed in the early 1940's when North Base was a military facility; the waterline is in very poor condition resulting in lost water from numerous repairs, damage to the overlying roadway and inconveniences to the traveling public and the surrounding neighborhood. Similarly, the University of Oklahoma (OU) owns a 14-inch cast iron waterline generally along the east side of Berry Road from Robinson to Lindsey and then east along the north side of Lindsey to Chautauqua. Numerous repairs to the OU waterline have also occurred causing further disruption to the neighborhood.
Staff coordinated with OU to allow the 14-inch waterline owned by both entities to be constructed parallel and directly adjacent to each other and bid as one project to reduce inconvenience to the public and achieve some cost savings through reduced excavation and reduced width of pavement repairs. The waterline improvements will be managed and paid by each entity under separate contract with the same contractor.
The Berry Waterline Replacement project (WA/WB0305) has been funded by the NUA and is expected to include 10,200 linear feet (LF) of 16-inch waterline along the west side of Berry Road from Robinson to Lindsey and approximately 2600 LF of 24-inch waterline east along Lindsey to Chautauqua where it will connect to the 16-inch Lindsey Waterline project completed in 2005. The 24-inch portion is part of an ongoing e...
Click here for full text