File #: K-1213-3    Version: 1 Name: K-1213-3 FYE 2013 Concrete Projects
Type: Contract Status: Passed
File created: 7/9/2012 In control: City Council
On agenda: 7/24/2012 Final action: 7/24/2012
Title: CONSIDERATION OF BID NO. 1112-62, CONTRACT NO. K-1213-3 WITH OPES, INC. IN THE AMOUNT OF $169,269.25; CHANGE ORDER NO. ONE INCREASING THE CONTRACT AMOUNT BY $13,730.75; PERFORMANCE BOND NO. B-1213-5, STATUTORY BOND NO. B-1213-6, MAINTENANCE BOND NO. MB-1213-3, AND RESOLUTION NO. R-1213-3 FOR FYE 2013 CONCRETE PROJECTS. ACTION NEEDED: Motion to accept or reject all bids meeting specifications; and, if accepted, award the bid in the amount of $169,269.25 to OPES, Inc., approve Contract No. K-1213-5, Change Order No. One increasing the contract by $13,730.75, Performance Bond No. B-1213-5, Statutory Bond No. B-1213-6, and Maintenance Bond No. MB-1213-3, authorize execution of the contract and change order, direct the filing of the bonds, and adopt Resolution No. R-1213-3. ACTION TAKEN: _____________________________________
Attachments: 1. Text File K-1213-3, 2. Bid List, 3. Project Table-2013 Concrete Project, 4. K-1213-3, 5. Change Order No. One K-1213-3, 6. Perf B-1213-5, 7. Stat B-1213-6, 8. MB-1213-3, 9. R-1213-3, 10. OPES PR
title
CONSIDERATION OF BID NO. 1112-62, CONTRACT NO. K-1213-3 WITH OPES, INC. IN THE AMOUNT OF $169,269.25; CHANGE ORDER NO. ONE INCREASING THE CONTRACT AMOUNT BY $13,730.75; PERFORMANCE BOND NO. B-1213-5, STATUTORY BOND NO. B-1213-6, MAINTENANCE BOND NO. MB-1213-3, AND RESOLUTION NO. R-1213-3 FOR FYE 2013 CONCRETE PROJECTS.

ACTION NEEDED: Motion to accept or reject all bids meeting specifications; and, if accepted, award the bid in the amount of $169,269.25 to OPES, Inc., approve Contract No. K-1213-5, Change Order No. One increasing the contract by $13,730.75, Performance Bond No. B-1213-5, Statutory Bond No. B-1213-6, and Maintenance Bond No. MB-1213-3, authorize execution of the contract and change order, direct the filing of the bonds, and adopt Resolution No. R-1213-3.

ACTION TAKEN: _____________________________________

body
BACKGROUND: The Fiscal Year ending June 30, 2013 (FYE 2013) Capital Improvement Program Budget includes four (4) concrete sidewalk programs. The projects are similar in nature so more competitive bids have historically been obtained by bidding them together. Therefore, staff combined these projects into one project entitled the FYE 2013 Concrete Projects. These four (4) projects are described in detail below and outlined in a table attached.

The Citywide Sidewalk Reconstruction Program is intended to assist property owners in repairing existing sidewalks and constructing new sidewalks along an entire city block. Property owners who wish to participate in the Citywide Sidewalk Reconstruction Project will pay fifty percent (50%) of the estimated cost with the City paying the remaining fifty percent (50%) from funds allocated to this project.

The Sidewalk Accessibility Program provides wheelchair ramps where none exist and rebuilds existing ramps that do not comply with the current Americans with Disabilities Act (ADA) standards. This project will construct approximately twenty-five (25) curb ramps. Locations are determined at...