File #: K-2021-11    Version: 1 Name: Well Lines Tecumseh & 108th Ave NE
Type: Contract Status: Passed
File created: 8/25/2020 In control: City Council
On agenda: 9/8/2020 Final action: 9/8/2020
Title: CONSIDERATION OF AWARDING BID 2021-18, APPROVING CONTRACT K-2021-11 BY AND BETWEEN THE NORMAN UTILITIES AUTHORITY AND HAMMER CONSTRUCTION IN THE AMOUNT OF $822,226.40 FOR THE 2015 WATER WELL LINES GENERALLY NEAR TECUMSEH ROAD AND 108TH AVENUE N.E. WATER WELL LIINES PROJECT, PERFORMANCE BOND B-2021-17, STATUTORY BOND B-2021-18, AND MAINTENANCE BOND MB-2021-9.
Attachments: 1. City Council Staff Report, 2. Cardinal Recommendation of Low Bidder.pdf, 3. Contract, 4. Performance Bond, 5. Statutory Bond, 6. MB-2021-9
Title
CONSIDERATION OF AWARDING BID 2021-18, APPROVING CONTRACT K-2021-11 BY AND BETWEEN THE NORMAN UTILITIES AUTHORITY AND HAMMER CONSTRUCTION IN THE AMOUNT OF $822,226.40 FOR THE 2015 WATER WELL LINES GENERALLY NEAR TECUMSEH ROAD AND 108TH AVENUE N.E. WATER WELL LIINES PROJECT, PERFORMANCE BOND B-2021-17, STATUTORY BOND B-2021-18, AND MAINTENANCE BOND MB-2021-9.

Body
BACKGROUND: The 2015 Water Well Lines project is a necessary component of the overall new water well project. It will connect the recently drilled water wells into the drinking water distribution system. Nine new water wells have been drilled and their accompanying well houses are currently being constructed. Well house completion is expected in December 2020.

Staff has separated the water transmission line segments into two separate projects. The NUA approved Contract K-1920-87 with Cardinal Engineering, LLC (Cardinal) November 12, 2019 to design one of the water line projects which is comprised of four segments. Segment 1 extends 5,200 feet north from Lakeview Park along 108th Ave NE. Segment 2 extends 1,600 feet east from Tecumseh Road and 108th Ave NE. Segment 3 extends 3,200 feet north from Tecumseh Road and 84th Ave NE. The final segment 4 extends 2,600 feet south from Tecumseh Road and 48th Ave NE. The proposed 12-inch water transmission lines were confirmed by staff utilizing our current water model. Cardinal completed the design July 2020.

DESCRIPTION: The advertisement for bids was published in the Norman Transcript on July 23, 2020 and July 30, 2020. Eleven contractors attended the mandatory pre-bid meeting held August 6, 2020. Project bids were opened on August 13, 2020 and seven (7) bids were received from the potential bidders. Hammer Construction of Norman, Oklahoma was the low bidder at $822,226.40. The bid results are shown in the attached letter from Cardinal; the engineering estimate was $1,374,325. Both staff and Cardinal recommend award to Hammer Construc...

Click here for full text