Title
CONSIDERATION AND AWARDING OF BID NO. 1213-16 FOR INLET FRAMES, GRATES AND CURB HOODS FOR THE STREET MAINTENANCE DIVISION.
1. HEAVY-DUTY CAST IRON 3 FLANGE INLET FRAME
2. HEAVY-DUTY CAST IRON DOUBLE UNIT
(LEFT AND RIGHT) INLET FRAMES WITH FASTENING HARDWARE
3. HEAVY-DUTY CAST IRON CENTER SECTION INLET FRAMES WITH FASTENING HARDWARE
4. HEAVY-DUTY CAST IRON TYPE L GRATE
5. HEAVY-DUTY CAST IRON TYPE V GRATE
6. A - 6-INCH MOUNTABLE CAST IRON CURB HOOD WITH FASTENING HARDWARE
B - 8-INCH MOUNTABLE CAST IRON CURB HOOD WITH FASTENING HARDWARE
7. DETECTABLE WARNING SURFACE/ADA TRUNCATED DOME, 2 FEET X 4 FEET TILE, CAST IN PLACE, BRICK RED
ACTION NEEDED: Motion to accept or reject all bids meeting specifications on Section 1; and, if accepted, award the bid to HD Waterworks Supply and Oklahoma Contractors Supply as the lowest and best bidders meeting specifications and Water Products of Oklahoma, Inc., as the alternate bidder.
ACTION TAKEN: ________________________________________
ACTION NEEDED: Motion to accept or reject all bids meeting specifications on Section 2; and, if accepted, award the bid to HD Waterworks Supply as the lowest and best bidder meeting specifications and Oklahoma Contractors Supply as the alternate bidder.
ACTION TAKEN: ________________________________________
ACTION NEEDED: Motion to accept or reject all bids meeting specifications on Sections 3 and 6A; and, if accepted, award the bid to Oklahoma Contractors Supply as the lowest and best bidder meeting specifications and HD Waterworks Supply as the alternate bidder.
ACTION TAKEN: ________________________________________
ACTION NEEDED: Motion to accept or reject all bids meeting specifications on Sections 4, 5, and 6B; and, if accepted, award the bid to HD Waterworks Supply as the lowest and best bidder meeting specifications and Water Products of Oklahoma, Inc., as the alternate bidder.
ACTION TAKEN: ________________________________________
ACTION NEEDED: Mot...