File #: GID-1718-27    Version: 1 Name: Receipt of ODEQ Permit for Rock Creek Rd Waterline Replacement Project (Flood Ave to Research Park Blvd).
Type: Permits Status: Passed
File created: 12/4/2017 In control: City Council
On agenda: 12/19/2017 Final action: 12/19/2017
Title: SUBMISSION AND ACKNOWLEDGING RECEIPT OF OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY CONSTRUCTION PERMIT WL000014170837 ISSUED NOVEMBER 13, 2017, FOR THE ROCK CREEK ROAD WATER LINE REPLACEMENT PROJECT (FLOOD AVENUE TO RESEARCH PARK BOULEVARD), AND DIRECTING THE FILING THEREOF.
Attachments: 1. Text File ODEQ Permit, 2. Location Map, 3. ODEQ Permit
Title
SUBMISSION AND ACKNOWLEDGING RECEIPT OF OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY CONSTRUCTION PERMIT WL000014170837 ISSUED NOVEMBER 13, 2017, FOR THE ROCK CREEK ROAD WATER LINE REPLACEMENT PROJECT (FLOOD AVENUE TO RESEARCH PARK BOULEVARD), AND DIRECTING THE FILING THEREOF.

Body
BACKGROUND: The ever increasing volume of traffic and the resulting increase in crashes at the intersections of Rock Creek Road with 12th Avenue NW and Trailwood Drive have exposed the need for new traffic signals and roadway modifications in the near future. The intersections are anticipated to justify the need for signalization in the near future. An aerial photo of this area is included as an attachment

On February 13, 2007, City Council adopted Resolution R-0607-85, which was later forwarded to both the Association of Central Oklahoma Governments (ACOG) and the Oklahoma Department of Transportation (ODOT), requesting federal funds to pay for 80% of the construction cost. In the resolution the City agreed to the terms and conditions of a federally funded project by stating its willingness to assume the responsibility for the preparation of engineering plans, the purchase of any additional right-of-way, the relocation of public utilities and funding of the local share of the construction cost, which is 20% of total construction cost.

The proposed project will also widen Rock Creek Road at the two intersections to provide exclusive left turn lanes for eastbound and westbound traffic. Additionally, the existing two-lane section on 12th Avenue NW north of Rock Creek Road will be widened to five lanes (including southbound left turn lane) plus bicycle lanes, as required in the City's Comprehensive Transportation Plan. Finally, the narrow-lane four lane section between the two signals will be widened to meet current standards, sidewalks along Rock Creek Road from Flood Avenue to Trailwood Drive will be constructed/replaced as needed, and fiber optic traffic signal interconn...