Title
CONSIDERATION OF AWARDING OF BID 1920-5; CONTRACT K-1920-8 BY AND BETWEEN THE CITY OF NORMAN, OKLAHOMA, AND SILVER STAR CONSTRUCTION COMPANY, INC., IN THE AMOUNT OF $1,440,000; PERFORMANCE BOND B-1920-13; STATUTORY BOND B-1920-14, AND MAINTENANCE BOND MB-1920-6 FOR THE URBAN ASPHALT PAVEMENT FYE 2020 LOCATIONS PROJECT; AND RESOLUTION R-1920-3 GRANTING TAX EXEMPT STATUS.
Body
BACKGROUND: In the Norman General Obligation Bond Election of 2016, voters approved the Street Maintenance Bond Program, a 5-year, 4-phase program to address maintenance needs on neighborhood streets. The four categories include (1) Urban Asphalt Street Rehabilitation, (2) Urban Concrete Street Rehabilitation, (3) Urban Road Reconstruction and (4) Rural Road Rehabilitation. Prior to the election, the City provided a list of all streets included in the program based upon the pavement condition data from the City's current Pavement Management System. The following is the list of the FYE 2020 Urban Asphalt Pavement project locations:
White Oak Circle - Oakhurst Ave. to E 2200 Block
Eufaula Street - Chautauqua Ave. to BNSF RR
Tonhawa Street - Jones Ave. to Ponca Ave.
Clearwater Drive. - Lindsey St. to Wheatland Dr.
Hallbrooke Court. - Hallbrooke Dr. to E 2200 Block
Bates Way - Reagan Cir. To Bates Ct.
Ithaca Drive - Marymount Rd. to Bates Way
Reagan Court - Hallbrooke Dr. to Bates Ct.
Halifax Way - Porter Ave. to Ridgefield Dr.
Highland Village Dr. - Porter Ave. to Timbershadow Dr.
Pecan Valley - Marbel Dr. to Marbel Dr.
Astor Dr. - 36th Ave. NW to Bishops Dr.
Tonhawa St. - University Blvd. to Lahoma Ave.
Tonhawa St. - Flood Ave. to Lahoma Ave.
Live Oak Dr. - Walnut Rd. to End
The roadways included in this project are located in established residential neighborhoods. The current roadways are constructed of asphalt pavement. The asphalt pavement is in poor condition. This project involves rehabilitation of the existing pavement including milling, deep patching, overla...
Click here for full text